June 2026
1. June
Today we started rebuilding the floor—40 cm of insulation down to the ground—it’s going to turn out really well.
.jpeg)
The radiators were then immediately removed, and I’ve already taken the wall plugs out, patched up the wall, and painted it.
.jpeg)
2. June
The underfloor heating is being installed—or at least they've started on it.
.jpeg)
I had a lot of paperwork to take care of today for the move—and—I continued working on the walk-in closet and put up the curtains.
.jpeg)
3. June
The underfloor heating was finished today—it looks great:
.jpeg)
And in the bathroom, there was the first detail—the "Belle Epoque" 1850 bathtub faucet—it was a must-have:
.jpeg)
4. June
That went quickly this time! Kim and Brian poured the concrete, spread it out, and smoothed it.:
.jpeg)
Yes, the bathroom is also on the way, along with the shower toilet:
.jpeg)
I went to Aars to register my Danish residence, then to Løgstor to drop off some boxes and do some shopping. Now I'm taking a break for the day and updating this blog a bit.